12/21/2012

12/13/2012

45' Otam

Phase One

Sandblasting complete, exposing gelcoat
All hardware being removed, all fiberglass repairs completed

Dismanteling steering, trim and drive systems to initate overhaul of systems

Propellers reconditioned

Blueprinting hullside, to identify imperfections, orange spots above stripes are the hull distortions to be repaired

Blueprinting process being performed

12/02/2012

This is the Ares 135, launched in 2007 and still looking great with the original pain job.